Pulsant expands with £4.5 million data hall in Manchester
Pulsant, UK provider of edge infrastructure and data centres, has cut the ribbon on its new £4.5 million data hall ...
Pulsant, UK provider of edge infrastructure and data centres, has cut the ribbon on its new £4.5 million data hall ...
Schneider Electric has announced a collaboration with NVIDIA to optimise data centre infrastructure and pave the way for ground-breaking advancements ...
Recently, a group of computer science students from Lycée International de Londres Winston Churchill embarked on a unique journey. Their ...
With AI continuing to supercharge UK data centre construction throughout 2024 and grids already under strain, energy solutions specialist, Aggreko ...
Data centres process an ever-increasing volume of digital media and other data throughout a global network of several billion devices. ...
Applied Digital Corporation, a designer, builder, and operator of next-generation digital infrastructure designed for high-performance computing (HPC) applications, has announced ...
EkkoSense, the leader in the provision of AI-powered data centre optimisation software, has planned to showcase the latest release of ...
By Elliott Turek, Director of Category Management, Europe, Schneider Electric In the dynamic landscape of healthcare, a transformative synergy is ...
Infinera has announced ICE-D, a new line of high-speed intra-data centre optics based on monolithic indium phosphide (InP) photonic integrated ...
Scality, a leader in reliable, secure and sustainable data storage software, has announced the results of a survey of 500 ...
Head office & Accounts:
Suite 14, 6-8 Revenge Road, Lordswood
Kent ME5 8UD
T: +44 (0)1634 673163
F: +44 (0)1634 673173